— i8o —
Name of the
navigable
waterway
or new works
A. The scheme
has been
approved
B. The scheme
has not been
approved or
no scheme
has been
drawn up
Ad i
Ad 2
Technical plans
and designs
General estimate of cost and extent
to which the expenditure is to
be covered by the State and
communes and internal or foreign
loans
Dura,;
of It
13
14
15
16
Industrial port
of Warsaw,
at Zezan;
fixed level
with a canal
20 kilometres
long, Zezan-
Zegrze (Bug).
River port of
Flock (Vis¬
tula) .
Porabka re¬
servoir on
the River So¬
la, 32 million
cubic metres.
Rojnow reser¬
voir on the
River Duna-
yetz, 228 mil¬
lion cubic
metres.
Kosewo Wkra
reservoir, 80
million cubic
metres.
B
A
A
The scheme is in the
possession of the Mi¬
nistry of Communi¬
cations.
The scheme is in the
possession of the Na¬
vigable Waterways
Department, at War¬
saw.
The scheme is in the
possession of the Na¬
vigable Waterways
Department, Cracow.
The scheme is in the
possession of the Mi¬
nistry of Communi¬
cations.
The scheme is in course
of being drawn up at
the Ministry of Com¬
munications.
Value of land acquired and
work already carried out,
approximately 1 o mil¬
lion zloty. Cost price
of work remaining to be
done, 12 million zloty.
State or joint-stock com¬
pany.
Rstimated cost : 5 million
zloty. 60 % having
already been laid out,
leaving 2 million zloty
still to be spent.
State.
Estimated cost : 15 million
zloty, 60 % having
already been laid out,
leaving 6 million zloty
still to be spent.
State.
Estimated cost: 30 million
zloty.
State.
Estimated cost
zloty.
State.
12 million