— 163 —
Table VII.
TECHNICAL RESULTS OF THE WORKS FINANCED BY THE LABOUR FUND
IN 1934-35 1
Works executed by Organs other than the State (Autonomous Administrations;
Private Undertakings with the Participation of Public Administrations).
Nature of work
Technical results
Share
of the Labour Fund
in the costs
of construction
(%)
1. Roads and bridges :
(a) Paved roads and bridges
(b) Road surfaces
2. Railways and tramways :
(a) Railways
(b) Tramways
3. Waterways and ports
4. Fundamental improvements.
5. Water-supply work and water
mains
6. Electrification
7. Gas supplies
8. Construction :
(a) Public buildings .
(b) Dwelling-houses2
9. Other works
New roads : 249 kilometres.
Roads rebuilt: 20 kilometres.
New roads : 78.7 kilometres.
Railway lines : 20 kilometres.
Tramway lines : 1.1 kilometres.
Regulation of navigable rivers : 28 kilometres.
Regulation of rivers : 25.8 kilometres.
Drainage : 27.6 kilometres.
Special improvements : 5,708 hectares.
Canals : 74 kilometres.
Piping : 74 kilometres.
Inter-urban systems : 333.8 kilometres.
Low-tension lines : 28 kilometres.
Gas-supply systems : 41.6 kilometres.
Construction : 841,000 cubic metres.
Construction : 71,000 cubic metres.
Adaptation and consohdation of building
lands of an area of 394,000 square metres.
57-3
77.2
64-3
51-8
69.4
87-3
70.2
69.5
44-7
61.9
82.6
65.0
1 From April 1st to December 31st, 1934.
2 Including the adaptation of building lands.
Table VII.
TECHNICAL RESULTS OF THE WORKS FINANCED BY THE LABOUR FUND
IN 1934-35 1
Works executed by Organs other than the State (Autonomous Administrations;
Private Undertakings with the Participation of Public Administrations).
Nature of work
Technical results
Share
of the Labour Fund
in the costs
of construction
(%)
1. Roads and bridges :
(a) Paved roads and bridges
(b) Road surfaces
2. Railways and tramways :
(a) Railways
(b) Tramways
3. Waterways and ports
4. Fundamental improvements.
5. Water-supply work and water
mains
6. Electrification
7. Gas supplies
8. Construction :
(a) Public buildings .
(b) Dwelling-houses2
9. Other works
New roads : 249 kilometres.
Roads rebuilt: 20 kilometres.
New roads : 78.7 kilometres.
Railway lines : 20 kilometres.
Tramway lines : 1.1 kilometres.
Regulation of navigable rivers : 28 kilometres.
Regulation of rivers : 25.8 kilometres.
Drainage : 27.6 kilometres.
Special improvements : 5,708 hectares.
Canals : 74 kilometres.
Piping : 74 kilometres.
Inter-urban systems : 333.8 kilometres.
Low-tension lines : 28 kilometres.
Gas-supply systems : 41.6 kilometres.
Construction : 841,000 cubic metres.
Construction : 71,000 cubic metres.
Adaptation and consohdation of building
lands of an area of 394,000 square metres.
57-3
77.2
64-3
51-8
69.4
87-3
70.2
69.5
44-7
61.9
82.6
65.0
1 From April 1st to December 31st, 1934.
2 Including the adaptation of building lands.
Set display mode to:
Universal Viewer |
Mirador |
Large image | Transcription
Images and transcriptions on this page, including medium image downloads, may be used under the Creative Commons Attribution 4.0 International Licence unless otherwise stated.
League of Nations > Communications and transit > Enquiry on national public works > (165) |
---|
Permanent URL | https://digital.nls.uk/195000495 |
---|
Shelfmark | LN.VIII |
---|
Description | Over 1,200 documents from the non-political organs of the League of Nations that dealt with health, disarmament, economic and financial matters for the duration of the League (1919-1945). Also online are statistical bulletins, essential facts, and an overview of the League by the first Secretary General, Sir Eric Drummond. These items are part of the Official Publications collection at the National Library of Scotland. |
---|---|
Additional NLS resources: |
|