— 162
B. Works executed by Organs other than the State (Autonomous Administrations ;
Private Undertakings with the Participation of Public Administrations).
Nature of work
i. Roads and bridges :
(a) Paved roads and bridges
(b) Road surfaces
2. Railways and tramways :
(a) Railways
(b) Tramways
3. Waterways and ports
4. Fimdamental improvements.
5. Water-supply work and water
mains
6. Electrification.
7. Gas supplies
8. Construction :
(a) Public buildings .
(b) Dwelling-houses1
9. Other works
Technical results
Share of the Labour Fund
in the costs
of construction (°/o)
New roads : 159 kilometres.
Roads rebuilt: 1,309 kilometres.
New roads : 74.4 kilometres.
Roads rebuilt : 15.1 kilometres.
Railway hues : 8 kilometres.
Tramway lines : 17.3 kilometres.
Regulation of rivers : 297.4 kilometres.
Dykes : 119.6 kilometres.
Canals : 39.2 kilometres.
Piping : 28.8 kilometres.
Connections with canals : 42 kilometres.
Inter-urban systems : 125 kilometres.
Dow-tension lines : 26.8 kilometres.
Gas supply systems : 8.6 kilometres.
Construction : 230.000 cubic metres.
Construction : 41,000 cubic metres.
Adaptation and consohdation of building
lands of an area of 575,000 .square metres.
Various constructions.
50.2
71.4
40.4
21.8
69.1
68.4
56.7
93-7
38.9
71.6
48.0
Including the adaptation of building lands.
B. Works executed by Organs other than the State (Autonomous Administrations ;
Private Undertakings with the Participation of Public Administrations).
Nature of work
i. Roads and bridges :
(a) Paved roads and bridges
(b) Road surfaces
2. Railways and tramways :
(a) Railways
(b) Tramways
3. Waterways and ports
4. Fimdamental improvements.
5. Water-supply work and water
mains
6. Electrification.
7. Gas supplies
8. Construction :
(a) Public buildings .
(b) Dwelling-houses1
9. Other works
Technical results
Share of the Labour Fund
in the costs
of construction (°/o)
New roads : 159 kilometres.
Roads rebuilt: 1,309 kilometres.
New roads : 74.4 kilometres.
Roads rebuilt : 15.1 kilometres.
Railway hues : 8 kilometres.
Tramway lines : 17.3 kilometres.
Regulation of rivers : 297.4 kilometres.
Dykes : 119.6 kilometres.
Canals : 39.2 kilometres.
Piping : 28.8 kilometres.
Connections with canals : 42 kilometres.
Inter-urban systems : 125 kilometres.
Dow-tension lines : 26.8 kilometres.
Gas supply systems : 8.6 kilometres.
Construction : 230.000 cubic metres.
Construction : 41,000 cubic metres.
Adaptation and consohdation of building
lands of an area of 575,000 .square metres.
Various constructions.
50.2
71.4
40.4
21.8
69.1
68.4
56.7
93-7
38.9
71.6
48.0
Including the adaptation of building lands.
Set display mode to:
Universal Viewer |
Mirador |
Large image | Transcription
Images and transcriptions on this page, including medium image downloads, may be used under the Creative Commons Attribution 4.0 International Licence unless otherwise stated.
League of Nations > Communications and transit > Enquiry on national public works > (164) |
---|
Permanent URL | https://digital.nls.uk/195000482 |
---|
Shelfmark | LN.VIII |
---|
Description | Over 1,200 documents from the non-political organs of the League of Nations that dealt with health, disarmament, economic and financial matters for the duration of the League (1919-1945). Also online are statistical bulletins, essential facts, and an overview of the League by the first Secretary General, Sir Eric Drummond. These items are part of the Official Publications collection at the National Library of Scotland. |
---|---|
Additional NLS resources: |
|