Table V.
EXECUTION OP WORKS CARRIED OUT WITH THE ASSISTANCE OP THE LABOUR FUND
IN I934-35-1
WORKS EXECUTED BV BODIES OTHER THAN THE STATE (AUTONOMOUS ADMINISTRATIONS;
Private Undertakings with Participation op Pubeic Administrations).
Nature of works
i. Roads and bridges :
(a) Paved roads and bridges.
(b) Road surfaces
Total.
2. Railways and tramways
(a) Railways
(b) Tramways
Total
9. Other works.
General total
Cost of works
Total cost
Total. . .
3. Waterways and ports
4. Fundamental improvements
5. Water-supply work and water
mains
6. Electrification
7. Gas supplies
8. Construction :
(a) Public buildings
(b) Dwelling-houses 2
Participation of
the kabour Fund
kabour
In thousands of zloty
8,485
5,128
I3.6I3
4,866
3,959
8,825
%
of total
cost
In thousands
of zloty
3,175
454
3,629
2,041
235
57-3
77.2
64.8
2,618
2,192
h,956
3,288
920
8,952
4,482
2,276
13.434
2,691
54,34!
1,818
i,9i3
8,392
2,284
411
5,539
3,i37
8,676
64-3
51.8
62.7
%
of total
cost
% of cost of
labour with
relation to
participation
of
the kabour
Fund
Employment
of labour
Working-days
(in thousands)
4,100
2,908
7,008
1,564
136
69.4
87-3
70.2
69-5
44-7
61.9
82.6
64.6
i,75o
36,345
65.0
66.9
1,700
1,629
1,639
5,l82
686
289
3,309
2,355
5 ,664
48.3
56.7
5i-5
49-3
30.0
46.8
84-3
73-5
79-4
76.6
57-9
74-7
62.2
74.8
43-3
20.9
3i-4
37-o
52-5
i,335
738
:, °73
4°3
25
428
1,487
25,284
42.2
55-3
46.5
89.6
85-7
61.7
50.0
7°-3
59-7
75-i
65-3
69.6
500
421
1,307
152
4i
712
528
1,240
387
6,549
Period April 1st to December 31st, 1934-
Including the adaptation of building lands.